Trades / 33 cards
Concrete + foundation
Footings, slabs, foundation walls, flatwork and what goes in them before the pour.
0115 cards
Before the foundation
Footings, slab and everything under it: drains, pipes, radon and sump. Once the concrete is poured, these are the hardest to change.
051 card
Before tile + floors
Waterproofing, backer board and floor prep that go under the finish you see.
0617 cards
Throughout the job
Choices and checks that aren’t tied to one stage. Settle them early, or check them as the work goes.
Kitchen, Bathroom and Stairs are open to everyone. The rest are in the full fieldbook.
Get the full fieldbook








