011 card
Before the foundation
Footings, slab and everything under it: drains, pipes, radon and sump. Once the concrete is poured, these are the hardest to change.
021 card
Before framing
Room sizes, openings, stairs, ceiling heights and anything structural. Cheap on paper, expensive once the walls are up.
0312 cards
Before rough-in
Where pipes, wires, ducts and boxes go, before the inspector signs off on them.
041 card
Before drywall
Blocking, insulation, fire blocking and anything else that lives inside the walls.
0617 cards
Throughout the job
Choices and checks that aren’t tied to one stage. Settle them early, or check them as the work goes.