Trades / 45 cards
Drywall + paint
Wallboard, fire-rated assemblies, finishing and paint.
021 card
Before framing
Room sizes, openings, stairs, ceiling heights and anything structural. Cheap on paper, expensive once the walls are up.
033 cards
Before rough-in
Where pipes, wires, ducts and boxes go, before the inspector signs off on them.
0411 cards
Before drywall
Blocking, insulation, fire blocking and anything else that lives inside the walls.
0630 cards
Throughout the job
Choices and checks that aren’t tied to one stage. Settle them early, or check them as the work goes.
KitchensFree
Kitchen, Bathroom and Stairs are open to everyone. The rest are in the full fieldbook.
Get the full fieldbook













